www.directional.ca
British Columbia
Langley
Langley
Foundations and Excavation
active
The end of the line was sheet piled during installation and the end was dug out and rip rap place from end to creek. Our employees receive continuous training in areas such as First Aid, Confined Spaces, WHMIS, etc. Room was extremely limited and the pipe string was fused into 6 sections and then fused on the fly during pullback. We have done extensive work in British Columbia and Alberta, as well as branching into the US with our subsidiary company Directional Mining & Drilling LLC where we have completed projects in numerous states. Tailgate meetings are held regularly to ensure employees are aware of the job specific hazards they may encounter on each site, coordinate activities with any other contractors and review all emergency and safe work procedures. Strive to provide a healthy and safe workplace for our employees. From digging the pits, de-watering, fusing, etc we have everytihing at our disposal without having to rely on rental companies to equip our projects. This project was completed in an environmentally sensitive area. A 24"steel casing approximately 10' long was constructed to protect the bundles from damage from collapsing soils behind the reamer. underground. 4 _ 8" HDPE pipes were bundled and pulled back. This term refers to the total greenhouse gas omissions caused by an organization, project or product. Waterways * Roadways * Existing Buildings. • 2,500 Feet of 3 1/2" (2 7/8 IF) Drill Pipe - 15' length. Dm&d's has an extensive inventory of equipment to complete all areas of HDD work. We will be happy to provide a quote, answer any questions or supply any additional information you may require. Dd30/20 Ditch Witch Directional Drill (Track Mounted) 10 Rods. Pipe Size: 5000m of 24", 30" and 32" DR17 HDPE Pipe. Pipe Size: Auguring 300m of 4", 10" and 16" steel pipe. Due to the extremely tight project site, DM&D customized it's drill in order to fit it into the area and utilized a crane to mobilize it into position. Work took place inside the Gas Plant and Safety was of the upmost importance!. • Twin 275hp John Deere power pack, 550hp Sundstrand hydraulic pumps HDPE closed and open. The drilling took place in a residential area, with a school along the drill path. Rig and now have eight drilling rigs of various sizes, the largest being 550,000 lbs. Following are a few of the more interesting projects we have undertaken over of the years. Set-up for this drill under the Fraser River required the equipment to be set up inside the Hydro Plant. Directional Mining & Drilling Ltd. The fast paced growth which so many municipalities are experiencing is putting strains on many existing infrastructures such as sewer, water, cable and telecommunications. Bc Hydro hired DM&D to drill a 580m 36" borehole underneath the Thompson River for the installation of 4 _ 4" and 4 _ 8" un-banded duct bundles. Dd40 Contractors Directional Drill (Track Mounted) 10' Rods. Delivery of the equipment required carefully planning and measuring to ensure everything would make it safely down the entrance ramp to the site location. The borepath ran parallel to the irrigation ditches for the farms, with a section running underneath the cranberry fields. We started out with one 10,000 lb. Drilling was underneath rail and Sky Train tracks. Location was in a park which had an elementary school located on the far corner (The children utilized the Park during recess and lunch hours). Our objective is to maintain a program that will reduce the number of injuries and illnesses, not merely in keeping with industry standards, but surpassing them. Dd240 Tulsa Rig Iron Directional Drill (Trailer Mounted) 30' drill rigs Rods. The site was a popluar park surrounded by high rise resident buildings on three side. Pipe Size: 500m of bundled 4", 6" and 18" steel pipe. We understand our responsibilitites as established by WorkSafe BC, and endeavor to meet or exceed these. Our Supervisors are the key to the success of the health and safety program at the workplace level. Dm&d has been able to achieve this goal through a functional occupational health and safety program and through the coordinated actions of the employer, supervisors, workers and the health and safety committee. Has the expertise and experience to meet the challenges of the most demanding directional drilling projects. And with concern for the environment being at the forefront of most peoples mind, managing this growth in an environmentally friendly way is of the upmost importance. And now proudly offer Augur Boring, Pipe Jacking, Tunneling and Pipe Ramming to our list of services provided. This project was located in an underground parkcade which had to be kept open during the drilling and pullback stages. Pipe Size: No Pipe - 42" Push Ream for Exploratory Drill Only. Conditions: 8" through shales and the 16" through gravels. In most cases the carbon output can be 80-90% less when utilizing HDD. During staging for pullback of the product pipe it was placed on top of stacked shoring cages to keep the road open for continued access of the delivery trucks to the loading bays. This project was located in a densely populated are in downtown Vancouver. • 10,000 Feet of 5" (4.5IF) Drill Pipe - 31' average length. Set in a highly populated urban setting. When you look at the carbon footprint of Directional Drilling vs. All muds and additives used in our drilling activities are non-toxic and by having an understanding of the conditions before we begin, the proper products in the appropriate quantities can be used to minimize the potential for any loss during drilling. Project scope was installation of a 18" carrier with 4 - 4" ducts insides. A very tight setup location and was needed for this project. Dm&d's goal is zero accidents and injuries. Dm&d completed the bore and installation of the pipe Directional using a 140,000lb rig. Pipe Size: Slip-lining a 16" high pressure water line with a 14" HDPE Pipe for 450m plus 4 new. We recognize and acknowledge that the success of our organization lies in the health and well-being of our people. Municipalities all over North America are beginning to make this a part of their bidding requirements as "Carbon Credits" become more and more important. The parkcade was located along the Waterfront and cruise ship terminal. Drilling was in an environmentally sensitive area. Our philosophy is to provide our clients with reliable and competitive service, all the while maintaining a superior level of professionalism, performance and productivity. This entailed an on-grade storm line which had to empty into a fish bearing creek. Work area on side of the road in Renton...no distruption to traffic. Dd80 American Augurs Directional Drill (Track Mounted) 15' Rods. Installed a sanitary forcemain under the South Thompson River. The creek was also lowered to match grade. For a brief description of each picture click on the photo to enlarge. - negative impact on residents and businesses is greatly reduced. Conductor: Entry - 60" casing for 60' and Exit - 54" casing for boring 200'. Pipe Size: 4000m total of 18" and 6" bundled steel epoxy coated pipe. Dd20 StraightLine Directional Drill (Track Mounted) 10 Rods. The height limitations in the parkcade also made for a very tight working site. By planning ahead we can potentially eliminate the possibility of any environmental issues arising. Directional Drilling address's these concerns and offers the following advantages to Project Owners:. In the past few years the catch-phrase "Carbon Footprint" has been heard with increasing regularity. After being craned in, the final position of the DD550 in David Lam Park. Line also had to run underneath a highway. The increased concerns over costs and ever stricter environmental regulations have dictated that innovative solutions be found. • 2,500 Feet of 3 1/2" (2 7/8 IF) Drill Pipe - 20' length. The duct bundles were installed in a hdd single pullback. • Numerous Commercial Trucks, Trailers, Flat Decks and Crew Vehicles. Tel: 604.513.9820 Fax: 604.513.9821 Toll Free: 1.888.572.5117. Supervis
No affiliations
No associations
ServiceRating
Directional Mining and Drilling Ltd does not yet have a rating. At this time, there are no reviews or comments for this contractor.
If you have personal experience with Directional Mining and Drilling Ltd, we encourage you to share that experience with our ServiceRating.ca community. Your opinion is very important and Directional Mining and Drilling Ltd will most certainly appreciate the feedback.
Profile ID: SRCA-CON-O-56201